ISO 20996 Revision Checker 40.60 Close of voting

The record

Thirteen dated steps, and the ones still to come

ISO records every stage of a standard with a code and a date. This is the full record for the draft, retrieved 2026-10-20, followed by the stages that have no date yet. The stage code is the fact; the date is what the watch follows.

Where the draft has been

Recorded lifecycle, ISO/IEC DIS 20996
StageWhat it meansDate
10.99New project approved2023-12-22
20.00New project registered in TC/SC work programme2023-12-22
30.00Committee draft (CD) registered2025-04-03
30.20CD consultation initiated2025-04-04
30.60Close of comment period2025-05-31
30.92CD referred back to Working Group2025-11-19
30.00Committee draft (CD) registered2025-11-19
30.20CD consultation initiated2025-11-20
30.60Close of comment period2026-01-16
30.99CD approved for registration as DIS2026-04-28
40.00DIS registered2026-04-29
40.20DIS ballot initiated: 12 weeks2026-07-01
40.60Close of voting2026-09-24

The draft was registered as a committee draft twice, in April 2025 and again in November 2025, after the first consultation referred it back to its working group. The second committee draft was approved for registration as a Draft International Standard on 28 April 2026. The DIS was registered the next day, the ballot opened on 1 July 2026 for twelve weeks, and voting closed on 24 September 2026.

What has not happened yet

Stages with no recorded date
StageWhat it would meanDate
40.92Full report circulated: DIS referred back to TC or SCNot recorded
40.93Full report circulated: decision for new DIS ballotNot recorded
40.99Full report circulated: DIS approved for registration as FDISNot recorded
50.00Final text received or FDIS registered for formal approvalNot recorded
60.00International Standard under publicationNot recorded
60.60International Standard publishedNot recorded

The next recorded event is the full report of the ballot. If the vote is positive, the draft is approved for registration as a Final Draft International Standard (40.99). If it is referred back, the working group revisits it (40.92), and a new ballot can be decided (40.93). Each path moves the planning date, which is why the watch is sold as a subscription and not as a one-off report.

How the planning date is derived

The planning date of 2027-09-13 is 328 days from today. It is an estimate, built from the close of voting on 2026-09-24 and the ordinary path through the approval and publication stages. ISO has not recorded a publication date, and this site does not present the estimate as one. Where the date appears on a page it is labelled an estimate, and the source record carries the same label.

What changes at each stage

The rules this is built from

Every requirement on this site is written from a held rule and points to the clause it came from. Nothing is invented while you wait.

How the record is made and where each source comes from. The continuity baseline is ISO 22301:2019, read here.